16 March 2007 06:36 [Source: ICIS news]
SINGAPORE (ICIS news)--Formosa Petrochemical Corp (FPC) will not increase its ethylene dichloride (EDC) capacity after the startup of the new upstream No 3 cracker in Mailiao and increase in available feedstock, a company source said on Friday.
Production at FPC’s 1m tonne/year EDC plant in Mailiao has not been slated for expansion even after ?xml:namespace>
The 1.2m tonne/year cracker project was earlier scheduled to start up at end-2006, but was delayed to the second quarter of this year due to a labour shortage and problems with securing construction materials.
If the new Formosa No 3 cracker results in an increase in EDC capacity, that would help ease the regional shortfall now being addressed by imports of deep-sea cargoes from south America, the US and the Middle East.
“As our caustic soda production requires stable output, there won’t be any EDC capacity increase,” said the company source.
Downstream projects which will come up in line with the new cracker include a 700,000 tonne/year styrene monomer (SM) unit at Formosa Chemicals and Fibre Corp (FCFC) and Nan Ya Plastics’ monoethylene glycol (MEG) and bisphenol-A (BPA) projects.
For the latest chemical news, data and analysis that directly impacts your business sign up for a free trial to ICIS news - the breaking online news service for the global chemical industry.
Get the facts and analysis behind the headlines from our market leading weekly magazine: sign up to a free trial to ICIS Chemical Business.
| ICIS news FREE TRIAL |
| Get access to breaking chemical news as it happens. |
| ICIS Global Petrochemical Index (IPEX) |
| ICIS Global Petrochemical Index (IPEX). Download the free tabular data and a chart of the historical index |