29 April 2009 12:17 [Source: ICIS news]
SINGAPORE (ICIS news)--?xml:namespace>
The statement added that “operations are back to normal”, without elaborating.
Several sources close to the company said natural gas supply had been restored this week and was being fed to the downstream petrochemical units, which include two crackers and facilities producing monoethylene glycol (MEG) and polyolefins.
The company was forced to reduce operations at Shuaiba in early April after a feedstock shortage relating to a “fire” at an adjacent liquefied petroleum gas (LPG) unit.
It was earlier reported that one cracker was consequently shut while the other one was operating at much-reduced rates. The total ethylene output from the two crackers is 1.7m tonnes/year.
Downstream of the crackers are two MEG units with capacities of 400,000 and 600,000 tonnes/year, a 600,000 tonne/year high density polyethylene (PE)/linear low density PE swing unit and a polypropylene line.
US major Dow Chemical and
Bohan Loh and Peh Soo Hwee contributed to this article
For more on MEG visit ICIS chemical intelligence
To discuss issues facing the chemical industry go to ICIS connect
Please visit the complete ICIS plants and projects database
For the latest chemical news, data and analysis that directly impacts your business sign up for a free trial to ICIS news - the breaking online news service for the global chemical industry.
Get the facts and analysis behind the headlines from our market leading weekly magazine: sign up to a free trial to ICIS Chemical Business.
| ICIS news FREE TRIAL |
| Get access to breaking chemical news as it happens. |
| ICIS Global Petrochemical Index (IPEX) |
| ICIS Global Petrochemical Index (IPEX). Download the free tabular data and a chart of the historical index |