SABIC’s No 4 Geleen cracker achieves on-spec production

08 November 2013 15:58  [Source: ICIS news]

LONDON (ICIS)--SABIC Europe’s Olefins 4 cracker at Geleen in the Netherlands has achieved on-spec production and is currently running at two-thirds of its capacity following a planned maintenance turnaround, a company source said on Friday.

“[The] start-up of SABIC naphtha cracker Olefins 4 runs according to plan, all materials are on spec as of today,” the source said, adding that the plant was gradually increasing throughput because of the integration of upgrade projects.

The upgrade projects will make the cracker more energy efficient.

The No 4 cracker, the larger of the two owned by SABIC at the site, has the capacity to produce 675,000 tonnes/year of ethylene, according to ICIS data, and was shut down for maintenance on 15-16 September.

Follow Nel on Twitter


By: Nel Weddle
+44 20 8652 3214



AddThis Social Bookmark Button

For the latest chemical news, data and analysis that directly impacts your business sign up for a free trial to ICIS news - the breaking online news service for the global chemical industry.

Get the facts and analysis behind the headlines from our market leading weekly magazine: sign up to a free trial to ICIS Chemical Business.

Printer Friendly

ICIS news FREE TRIAL
Get access to breaking chemical news as it happens.
ICIS Global Petrochemical Index (IPEX)
ICIS Global Petrochemical Index (IPEX). Download the free tabular data and a chart of the historical index