NewsFlashMarun to shut cracker for repairs
20 September 2007 10:10 [Source: ICIS news]
SINGAPORE (ICIS news)--Iran’s Marun Petrochemical will shut its 1.1m tonne/year cracker for 10-15 days for unscheduled repairs, a source close to the company said on Thursday.
“The cracker will be shut at the very end of this month for 10 to 15 days at the most for a mechanical change,” he said, adding that downstream plants will reduce operating rates in accordance with the reduction of ethylene supply.
Ethylene is fed downstream to a 300,000 tonne/year high density polyethylene (HDPE) unit and a 300,000 tonne/year low density PE (LDPE) unit.
The other downstream plants, such as the 400,000 tonne/year monoethylene glycol (MEG) plant, will keep low production rates.
The cracker shutdown has capped ethylene exports from Iran, with spot sales slowing to a trickle for October.
ICIS Copyright © Reed Business Information 2009
Author: Steve Tan+65 6780 4359
For the latest chemical news, data and analysis that directly impacts your business sign up for a free trial
to ICIS news - the breaking online news service for the global chemical industry.
Get the facts and analysis behind the headlines from our market leading weekly magazine: sign up to a free
trial to ICIS Chemical Business.
Links posted in this story: