Jam cracker to achieve on-spec output by end-Mar
11 January 2008 04:00 [Source: ICIS news]
SINGAPORE (ICIS news)--Iran's Jam Petrochemical expects to achieve on-spec production at its 1.32m tonne/year cracker at Assaluyeh by end-March and start up its derivative units by July, a source close to the company said late on Thursday.
“The cracker started up at the end of December, but it will take two-three months to get on-spec output,” the source added.
The start up of the cracker complex had been delayed several times.
Jam’s derivative plants include a 300,000 tonne/year high density polypropylene (HDPE) plant, which is ready and waiting to be fed ethylene from the cracker, as well as a 300,000 tonne/year polypropylene (PP) plant and a 300,000 tonne/year HDPE/linear low density PE (LLDPE) swing plant.
Jam is a wholly owned subsidiary of Iran’s National Petrochemical Co.
ICIS Copyright © Reed Business Information 2009
Author: Prema Viswanathan+65 6780 4359
For the latest chemical news, data and analysis that directly impacts your business sign up for a free trial
to ICIS news - the breaking online news service for the global chemical industry.
Get the facts and analysis behind the headlines from our market leading weekly magazine: sign up to a free
trial to ICIS Chemical Business.
Links posted in this story: